<?xml version="1.0" encoding="UTF-8"?>
<rdf:RDF xmlns="http://purl.org/rss/1.0/" xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#" xmlns:dc="http://purl.org/dc/elements/1.1/">
<channel rdf:about="https://repository.utm.md/handle/5014/13431">
<title>2021</title>
<link>https://repository.utm.md/handle/5014/13431</link>
<description/>
<items>
<rdf:Seq>
<rdf:li rdf:resource="https://repository.utm.md/handle/5014/13455"/>
<rdf:li rdf:resource="https://repository.utm.md/handle/5014/13454"/>
<rdf:li rdf:resource="https://repository.utm.md/handle/5014/13453"/>
<rdf:li rdf:resource="https://repository.utm.md/handle/5014/13452"/>
</rdf:Seq>
</items>
<dc:date>2026-04-20T16:28:02Z</dc:date>
</channel>
<item rdf:about="https://repository.utm.md/handle/5014/13455">
<title>Contribuţii în sporirea performaţei execuţiei lucrărilor de construcţie a terminalului vamal din oraşul Ocniţa</title>
<link>https://repository.utm.md/handle/5014/13455</link>
<description>Contribuţii în sporirea performaţei execuţiei lucrărilor de construcţie a terminalului vamal din oraşul Ocniţa
VRABIE, Antonina
Obiective care au stat la baza cercetării contribuției în sporirea performanței lucrărilor de construcție au fost: analiza proiectului de construcție a terminalului vamal din or. Otaci, r-nul Ocnița;analiza problemelor apărute în cadrul șantierului pe parcursul procesului de construcție;descrirea proceselor de construcție; decizii adoptate în urma abaterilor de la proiectul de bază.; Objectives that were the basis for researching the contribution to increasing the performance of construction works were: analysis of the construction project of the customs terminal in the town. Otaci, Ocnița district; analysis of problems encountered during the construction site during the construction process; description of construction processes; decisions taken following deviations from the basic project.
Fişierul ataşat conţine: Cuprins, Rezumat, Summary, Introducere, Bibliografie.
</description>
<dc:date>2020-01-01T00:00:00Z</dc:date>
</item>
<item rdf:about="https://repository.utm.md/handle/5014/13454">
<title>Managementul proiectelor în construcţii orientat pe performanţa resurselor umane</title>
<link>https://repository.utm.md/handle/5014/13454</link>
<description>Managementul proiectelor în construcţii orientat pe performanţa resurselor umane
URSU, Evghenii
Teza de master are ca scop descrierea unor parametri care în mod direct influențează productivitatea, analiza posibiliății de a micșora orele de lucru în săptămînă, sinergia în echipă, și cum productivitatea descrește invers proporțional cu numărul de muncitori în echipă. Reișind din scopul propus au fost formulate următoarele obiective: depistarea problemelor cu care se confruntă managerul Resurse Umane; analiza soluțiilor nestandarte pentru creșterea productivității; descrierea modului de aplicare a soluțiilor în practica de construcții, examinarea modului de salarizare și de normare a muncii, analiza activității unei companii din Republica Moldova.; The master's thesis aims to describe parameters that directly influence productivity, the analysis of the possibility of reducing working hours per week, team synergy, and how productivity decreases inversely with the number of workers in the team. Succeeding from the proposed goal, the following objectives were formulated: detecting the problems faced by the Human Resources manager; analysis of non-standard solutions to increase productivity; description of how to apply solutions in construction practice, examination of how to pay and standardize work, analysis of the activity of a company in the Republic of Moldova.
Fişierul ataşat conţine: Rezumat, Annotation, Cuprins, Introducere, Bibliografie.
</description>
<dc:date>2020-01-01T00:00:00Z</dc:date>
</item>
<item rdf:about="https://repository.utm.md/handle/5014/13453">
<title>Managementul proiectelor în construcţii în Republica Moldova</title>
<link>https://repository.utm.md/handle/5014/13453</link>
<description>Managementul proiectelor în construcţii în Republica Moldova
ŢURCAN, Artiom
Lucrarea dată are ca scop determinarea importanței managementului proiectului în condiții reale, cercetând durata de viață a proiectului. Obiectivul proiectului dat este executarea lucrărilor de reparație și reconstrucție a Sectorului de poliție nr.2 al IP Florești din satul Mărculești r-nul Florești. Au fost urmați toți pașii de la studiul de fezabilitate, procedură de achiziție, semnarea contractului, execuția lucrărilor și darea în exploatare a bunului.; This work aims to determine the importance of project management in real conditions, researching the lifetime of the project. The objective of this project is the execution of repair and reconstruction works of the Police Sector no. 2 of Floresti PI from Marculesti village, Floresti district. All the steps were followed from the feasibility study, the procurement procedure, the signing of the contract, the execution of the works and the commissioning of the property.
Fişierul ataşat conţine: Rezumat, Summary, Cuprins, Introducere, Bibliografie.
</description>
<dc:date>2020-01-01T00:00:00Z</dc:date>
</item>
<item rdf:about="https://repository.utm.md/handle/5014/13452">
<title>Dezvoltarea propriei afaceri privind construcţia gheretei comerciale, satul Coşniţa, raionul Dubasari</title>
<link>https://repository.utm.md/handle/5014/13452</link>
<description>Dezvoltarea propriei afaceri privind construcţia gheretei comerciale, satul Coşniţa, raionul Dubasari
SIROTILO, Denis
Scopul studiului de fezabilitate prezentat în lucrarea de față este de a identifica și analiza oportunitatea de investiție în construcția unei gherete comerciale în satul Coșnița, raionul Dubăsari, pentru dezvoltarea propriei afaceri de comercializare a produselor de cofetărie / patiserie și băuturi calde. În cadrul studiului sunt analizate toate informaţiile disponibile pentru a vedea dacă „părţile componente” pot funcţiona astfel încât, atât din punct de vedere tehnic, cât şi economic încât să rezulte un concept viabil.
Fişierul ataşat conţine: Rezumat, Summary, Cuprins, Introducere, Bibliografie.
</description>
<dc:date>2020-01-01T00:00:00Z</dc:date>
</item>
</rdf:RDF>
